0 Пользователей и 1 Гость просматривают эту тему.

01 Октябрь 2010, 12:00:14
  • С.Т.О.
  • Завсегдатай
  • *
  • Сообщений: 317
  • Благодарностей: 18
    • Пенза
Парни нужна инфа(тест план)  Lukas DPC R8443B255D

01 Октябрь 2010, 14:40:19
#1
  • Моя хата там, куда я брошу свою кепку.
  • С.Т.О.
  • Ветеран
  • *
  • Сообщений: 2069
  • Благодарностей: 252
  • Александр Николаевич, Дизелюб и Дизельвед
    • Vilnius, Lietuvos Respublika
© LUCAS 1996
Test Plan: 8443B250D



u   Download

Applic:   Peugeot XD 3T
Issue No:      2
Date:   03/07/89

Pumps covered:
8443B255D       R8443B255D



PUMP SPECIFICATION

Rotation:    Clockwise
Plunger Diameter:    7.5  mm
Roller to roller:    50.60 mm
Advance Type:    Automatic speed and light load.
Governor type:    Mechanical mini-maxi.
Gov. Link Length:    16.5 ±  0.2 mm
Throttle lever link hole:    -
Gov.arm hole No.:    -
Drive type:    Externally splined hub - unsupported shaft.
Light load advance by external adjustment.
Boost control.
Stop solenoid 12 V.
Double lever idling.
Automatic advance override

ISO TEST CONDITIONS.

This data is only valid for the test conditions specified and the
following test benches:    HA3000/HA2500/HA1150/HA1100MkII/HA875
                                  HA700/HA400/AVM/PGM
Test Fluid:    ISO 4113 at 40 ± 2 °C.
Nozzles:    ISO 4010.
Nozzle opening pressure:    125 +3  -0  bar.
H.P. pipes:    6 x 2 x 600 mm (ISO 4093.1)
H.P. Outlet Connections:    Original (M12 x 1.5)
Test machine drive:    ADC103
Test machine drive in supported position.
Inlet feed pressure:    0.1 bar

PRE-TEST NOTES

3.5 mm shim fitted in advance housing.
Retain idling lever using 3mm dia. rod, SIN RD/TOOLS A13
LLA valve lever to be at 90° to pump axis.
See SIN RD/PUMPS 67 (If Pump Housing or Advance parts replaced)
Fit advance gauge to speed piston end.
Timing:   -To accurately set the internal and external timing, use
the following tools:    1804-003/1804-615

ISO TEST PROCEDURE

Test    Operation       S/C      RPM    Requirements
1.    Priming           (C)      100    Obtain delivery from all injectors.
                               -1000    No air in pump backleak.
2.    Transfer press.   (S)     1000     4.4 ±  0.2 bar, Boost  0.8 bar.
      (Initial set.)                    (Tool 7244-382),SIN RD/PUMPS 71
3.    Transfer press.   (C)      500     3.4 to  4.5 bar, Boost    0 bar.
                                        (Tool 7244-382) SIN RD/PUMPS 71
Stop test machine & wait 10 sec min. Cambox press. 0.1 bar max.
4.    Advance Gauge     (S)        0        0 mm (    0°) Boost     0 bar.
                                        SIN RD/TOOLS 18 (Tool 7244-590)
5.    XS fuel valve     (S)      125    Increases by     3 to    12 litre/hr.
      Backleak change                   Boost    0 bar. Throttle closed.
      (Initial set)                     SIN D109
                                        LLA lever towards HP outlets.
Set LLA valve lever at 90° to pump axis.
6.    Throttle test     (C)      400       1 cm3 maximum, Throttle closed.
                                        Boost     0 bar.
7.    T. P Vacuum       (C)      100     0.5 bar vacuum. 60 seconds maximum.
                                        Boost    0 bar. Tool 7244-382.
8.    Transfer press.   (C)       70    0.35 bar minimum. Boost    0 bar.
                                        (Tool 7244-382) SIN RD/PUMPS 71
9.    Advance           (S)     1500      3.6 mm ( 4.75°) Boost   0.8 bar.
      (Full load)                       SIN RD/TOOLS 18. (Tool 7244-590)
10.   Transfer press.   (C)     1500     5.2 to  6.3 bar, Boost  0.8 bar.
                                        (Tool 7244-382) SIN RD/PUMPS 71
11.   Boost control     (S)      750      43 to   45 mm3/st. Boost    0 bar.
12.   Anti-stall        (S)      450     1.9 to  2.4 cm3, Tool 1804-481.
                                        Boost     0 bar.
                                        SIN RD/PUMPS A81 & TOOLS A14.
13.   Idling screw      (S)      400     1.9 to  2.4 cm3, Boost     0 bar.
                                        Remove 3mm dia. rod.
14.   LLA Linkage       (S)      500    Delivery    26 to    34 mm3/st.
                                        Boost  0.8 bar. Tool 1804-612.
                                        Throttle   15 ±   2 mm off min. stop
                                        Advance   0 to 0.5 mm (  0 to 0.7°)
                                        Tool 7244-590
Lock LLA linkage in this position.
15.   LLA Advance       (C)      500        2 to   2.9 mm (  2.7 to   3.9°)
                                        Boost   0.8 bar.
                                        Throttle as test(14) -    1 mm.
                                        Tool 7244-590
16.   Advance           (C)     1000      1.5 to   2.4 mm (    2 to   3.2°)
      (Full load)                       Boost   0.8 bar.
                                        SIN RD/TOOLS 18 (Tool 7244-590)
17.   LLA Advance       (C)     1500      6.3 to   7.8 mm (  8.4 to  10.4°)
                                        Boost   0.8 bar.
                                        Throttle closed. Tool 7244-590.
Stop test machine - remove tool 7244-382
Fit stop solenoid.
18.   Stop solenoid     (C)      400     0.4 cm3 max., De-energize solenoid.
                                        Boost    0 bar.
Stop test machine & wait 10 sec. min. Cambox press. 0.1 bar max.
Energise solenoid shut-off with 12 V.
Screw in excess fuel valve adjustment screw.
19.   XS fuel valve     (S)      125    Increases by     3 to    12litre/hr.
      Backleak change                   Boost    0 bar. Throttle closed.
                                        3mm dia. rod removed. SIN D109
Stop test machine & wait 10 sec min. Cambox press. 0.1 bar max.
20.   Excess delivery   (C)      100     8.4 cm3 minimum, Advance 0 mm,
                                        Boost   0bar(7244-590)SIN RD/TOOLS 18
21.   LLA Advance       (C)      270      1.9 to   2.6 mm (  2.5 to   3.4°)
                                        Boost     0 bar.
                                        Throttle closed. Tool 7244-590.
22.   Cambox pressure   (C)      270     0.65 to  0.85 bar. Boost     0 bar.
                                        Throttle closed. Tool 1804-447B.
23.   Max. delivery     (S)     1875    60.5 ±  0.5 mm3/st.
                                        Boost  0.8bar,Max. spread    4mm3/st.
                                        Tools 1804-423 & 1804-448
24.   Cambox pressure   (C)     1875     0.65 to  0.85 bar. Boost   0.8 bar.
                                        Throttle closed. Tool 1804-447B.
25.   Gov. delivery     (C)     2000    Record average delivery,Boost  0.8bar
26.   Gov. operation    (S)     2300    25.5 to 28.5 mm3/st, Boost  0.8 bar.
27.   Gov. cut-off      (C)     2800    Maximum    2 cm3, Line max.  2.4 cm3.
                                        Boost   0.8 bar.
28.   Advance           (C)     2800      5.4 to   6.6 mm (  7.2 to   8.8°)
      (Full load)                       Boost   0.8 bar.
                                        SIN RD/TOOLS 18 (Tool 7244-590)
29.   Gov. delivery     (C)     2000    Minimum as test(25), Boost  0.8 bar.
30.   Delivery(F.L.)    (C)     1000    10.8 to 11.6 cm3. Boost   0.8 bar.
31.   Backleakage       (C)     1000      30 to   50 cm3 per 100 shots.
                                         0.30 to  0.50 litre per minute.
                                        Boost  0.8 bar.
32.   Boost control     (S)      750      44 ±  0.5 mm3/st. Boost    0 bar.
33.   Delivery(F.L.)    (C)     1875    11.8 to 12.4 cm3. Boost   0.7 bar.
34.   Delivery(F.L.)    (C)      500     8.9 cm3 maximum, Boost    0 bar.
35.   Advance-          (C)      500     3.2 to  4.3 mm ( 4.2 to  5.7°)
      Override                          Override in maximum position.
                                        Tool 7244-590
36.   Internal timing   S/C             HP outlet'X ', Press 80 bar
      -Micrometric                      Torque  0.16daN.m
                                        Tools 1804-003 & 1804-615
                                        SIN RD/PUMPS 102,TOOLS 5 on 4 outlets
37.   External timing   S/C             Stamp timing value on the timing disc
                                        Refer to product application sheet.
                                        Tool 1804-615.
                                        Shows if timing is at beginning of
                                        injection or at TDC.

REFER TO STATEMENT AT END OF EXPLANATORY NOTES REGARDING MAXIMUM
FUEL AND SPEED SETTING AND VARIATIONS IN ENGINE PERFORMANCE.

Кувалда в руках ума не прибавляет.

01 Октябрь 2010, 19:22:57
#2
  • С.Т.О.
  • Завсегдатай
  • *
  • Сообщений: 317
  • Благодарностей: 18
    • Пенза
Спасибо

02 Октябрь 2010, 02:27:26
#3
  • Моя хата там, куда я брошу свою кепку.
  • С.Т.О.
  • Ветеран
  • *
  • Сообщений: 2069
  • Благодарностей: 252
  • Александр Николаевич, Дизелюб и Дизельвед
    • Vilnius, Lietuvos Respublika
Пожалуйста.
Кувалда в руках ума не прибавляет.

 

ТНВД LUKAS PF09 ПОСЛЕ ЗАМЕНЫ НЕТ ПОДАЧИ ТОПЛИВА НА ФОРСУНКИ

Автор Женя1990Раздел Топливный участок

Ответов: 1
Просмотров: 1511
Последний ответ 17 Февраль 2018, 17:50:16
от kuzja
Подскажите по насосу LUKAS ????

Автор VetalРаздел Топливный участок

Ответов: 2
Просмотров: 1335
Последний ответ 23 Июнь 2015, 06:04:53
от Vetal
Форсунки LUKAS

Автор ZlayabelkaРаздел Топливный участок

Ответов: 2
Просмотров: 2532
Последний ответ 29 Январь 2014, 21:48:25
от Zlayabelka
Пробить Lukas

Автор Egor__Раздел Топливный участок

Ответов: 3
Просмотров: 1306
Последний ответ 22 Март 2017, 22:02:36
от dieselservis